The Contract Management Module is fully
integrated with the
Estimating,
Contract
Sales,
Purchasing and
Subcontractor
Management modules. In addition there are
links to core financials for the production
of General Ledger Journal Vouchers. This
module has been designed to monitor all
revenue and expenditure to a user defined
level of detail and, where required, to
compare actual against budget. Budgets can
be input manually or can be electronically
updated from the Estimating module. Details
are held by original and revised budgets.
In today's competitive environment it is
vital to ensure that tight control is
exercised over all costs incurred on any
project irrespective of size. By the same
token it is also vital that any variations
to the original contract can be noted and
that these variations are billed to the
client. This module gives managers the tools
necessary to isolate potential loss making
situations and to take corrective action as
early as possible. Conversely, profitable
opportunities can be identified and
capitalised upon.
The Contract Management module provides the
environment for comprehensive cost and
revenue control in any contracting
situation. The module is highly
parameterised and cost elements, cost
sub-elements, cost heads and all enquiries
are user definable to provide a powerful
tool that can be adapted for use by all
forms of contracting companies. All
budgeting, costing and revenue information
is updated from the various integrated
modules as well as routines within the
module for employee and plant timesheets and
journals.
Comprehensive reporting and enquiry
facilities are provided to cover both
current and historical transactions. The
system is capable of holding details of
contracts that span several years which
ensures rigorous control over costs and
revenues by user defined time scales.
All enquiry screens can be exported directly
to Microsoft Excel for further analysis if
required.
The system is based on a user defined multi
tiered structure to provide drill down
capabilities to original source documents.
There are no limits to the numbers of field
types within each level.Users with the
integrated Estimating module tend to have
the cost structure mirror the take off
structure but all options are open. A
suggested structure may be as follows:
LEVEL 1 = Contract
(a single job. Housebuilders tend to use
this for a site. In addition there are a
number of analysis fields available to sort
contracts by region, customer, contracts
manager, type of work etc.)
LEVEL 2 = Cost Element
(the most common use of this is to split
between plant, labour, materials,
subcontractors, others/preliminaries and
sales. Can also be a main section of work as
per take off/BOQ. Housebuilders tend to use
this for a plot or house type)
LEVEL 3 = Cost Sub-Element
(this is an optional level. Generally used
to mirror a sub section of work as per take
off/BOQ. Housebuilders tend to use this for
build stages. Users splitting between plant,
labour etc. as level 2 above tend not to use
this level)
LEVEL 4 = Cost Head
(used for the detailed analysis of costs and
revenue. Details are held by value and
quantity [where relevant] )
LEVEL 5 = Transactions
(details of all transactions for the
selected cost head and period range)
LEVEL 6 = Original transaction document
selected from Level 5
which is the original document input screen.
Shown above is an example of a drill down
after selecting a contract from a list of
current contracts. Shown at level 1 are 10
columns from a list of 50+ columns of
information available. Selected sets of
information columns can be saved by users to
suit various purposes without limit.
It is possible to drill down from an invoice
input screen to Purchase Order and Delivery
Notes where relevant.
The drill down facility is available for all
types of transactions which affect a
contract.